Champlain Bridge work delayed by construction setbacks
Thu, Oct 25: The new Champlain Bridge, which was set to open in December, won’t be delivered on time. As Global’s Billy Shields explains, the consortium in charge of the bridge construction blames a crane operator strike, the summer heat wave and a lightning strike for the delays. Source link